Industrial Engineering & Management Systems Vol.14 No.2 pp.129-158
DOI : https://doi.org/10.7232/iems.2015.14.2.129

Optimal Ordering Policy in Dual-Sourcing Supply Chain Considering Supply Disruptions and Demand Information

Naoki Watanabe, Etsuko Kusukawa*
Graduate School of Engineering, Osaka Prefecture University, Osaka, Japan
Corresponding Author, kusukawa@eis.osakafu-u.ac.jp
January 2, 2015 April 24, 2015 May 28, 2015

ABSTRACT

It is necessary for retailers to determine the optimal ordering policy of products considering supply disruptions due to a natural disaster and a production process failure as quality and machine breakdowns. Under the situation, a dualsourcing supply chain (DSSC) is one of effective SC for retailers to order products reliably. This paper proposes the optimal ordering policy of a product in a DSSC with a retailer and two manufacturers. Two manufacturers may face supply disruptions due to a natural disater and a production process failure after they received the retailer’s order of products. Here, two scenarios of demand information of products are assumed: (i) the demand distribution is known (ii) mean and variance of the demand are known. Under above situations, two types of DSSC are discussed. Under a decentralized DSSC (DSC), a retailer determines the optimal ordering policy to maximize his/her total expected profit. Under the integrated DSSC (ISC), the optimal ordering policy is determined to maximize the whole system’s total expected profit. Numerical analysis investigates how demand information and supply disruptions affect the optimal decisions under DSC and ISC. Besides, profitability of supply chain coordination adjusting the wholesale price is evaluated to encourage the optimal decision under ISC.


초록


    Japan Society for the Promotion of Science
    No. 25350451

    1.INTRODUCTION

    An 8.9-magunitude earthquake hits off the east coast of Japan at 11th March, 2011. The earthquake triggered a large tsunami that battered many buildings there. Specifically, when the massive earthquake hits industrial plants, plants for production and distribution chains may be damaged and this may cause supply disruptions. Thus, recent catastrophic events, such as the recent earthquake and tsunami in Japan, underline the dramatic effect of supply disruptions in global supply chain (Zeiler, 2011; Whipp, 2011; MacKenzie et al., 2012; Jabbarzadeh et al., 2012; Xanthopoulos et al., 2012). If a great natural disaster occurs, it will be possible to occur the following things during several months after the earthquake:

    • (i) the shortage of products such as materials, components and final products due to reduction of the production quantity,

    • (ii) delay of due date of products due to traffic disturbance,

    • (iii) delay of product sales.

    Such a great natural disaster has ever occurred and in not only Japan but also other foreign countries such as the United States, Turkey, Indonesia, Philippines, etc. The earthquake will occur in many countries where a natural disaster is likely to occur in the future. So, it is important for decision makers to consider the impacts of disasters on the optimal inventory policy of a variety of products.

    Also, supply chain management assumes a major role in the logistics activities associated with responding to disasters caused by hazards such as major hurricanes, earthquakes and so on. Regarding the effect of natural disasters on the supply disruptions, there are some previous papers (Ozbay and Ozguven, 2007; Lodree Jr. and Taskin, 2008; Dillon and Mazzola, 2010; Li et al., 2012). Ozbay and Ozguven (2007) focused on the effects of natural disasters on the delivery and consumption processes in an efficient and quick-response humanitarian inventory management model. Both delivery and consumption are modeled as stochastic processes. This previous study determined the minimal safety stock level of an inventory to prevent the disruption. The Hungarian inventory Control Model was used to solve this optimal decision. Lodree Jr. and Taskin (2008) pointed out that supply chain and logistics response to disaster could be very costly. So, this previous paper discussed emergency response supply chain decisions with hazards that created the need for disasterrelief operations. The optimal inventory level were determined in consideration of the uncertainty in product demands due to hazards.

    In additions to supply disruptions due to natural disasters, there are supply uncertainty in supply chains due to various failures such as machine breakdowns in production processes of suppliers and manufacturers. Here, supply uncertainty is a major issue in both the industrial and academic worlds. Most of the papers considering supply uncertainty focus on the production planning problems of uncertain production capacity, random manufacturing yield, or unreliable supplier (Gerchak et al., 1988; Parlar and Perry, 1996; Zimmer, 2002; Gupta and Cooper, 2005; Chopra et al., 2007; Serel, 2008; He and Zhang, 2008; Keren, 2009; Pac et al., 2009; Xu, 2010; He and Zhang, 2010; Li et al., 2010; Giri, 2011; He and Zhao, 2012; Li et al., 2012; Tang et al., 2012a, 2012b; Xanthopoulos et al., 2012; Li et al., 2013). Giri (2011) focused on an inventory model for a single type of products and a single period in which the retailer could source from two suppliers. This paper assumed that the primary supplier was cheaper but unreliable in the sense that it generated supply yield uncertainty, whereas the secondary supplier was perfectly reliable but more expensive. The reliable supplier’s capacity was fixed and the retailer could place an order more than the quantity reserved in advance. He and Zhao (2012) studied the supplier’s raw-material production- planning decision, the retailer’s replenishment decision, and the choice of contract for a three-tier supply chain with uncertainty about both demand and raw-material yield. This previous paper investigated contracts terms that coordinated raw-material planning and replenishment decisions and achieved the most efficient performance of the entire supply chain. The production-decision problem was discussed for a risk-averse supplier who faced supply uncertainty.

    Also, it has been a significant problem to design coordination schemes under supply uncertainty so as to increase supply chain performance and properly allocate the supply risk between channel members (Gurnani and Gerchak, 2007; Guler and Bilgic, 2009; Yan et al., 2010; He and Zhao, 2012; Li et al., 2013; Xu and Lu, 2013; Dillon and Mazzola, 2010). Li et al. (2013) discussed a generalized supply chain model subject to supply uncertainty after the supplier chose the production input level. This previous paper focused on the interface between supply uncertainty and supply chain coordination. The underlying double marginalization of a supply chain was explored, considering supply uncertainty and the related problem of coordination contract design. Xu and Lu (2013) considered a price-setting newsvendor model in which a firm needed to make joint inventory and pricing decisions before the selling season. Here, the supply process was uncertain since the received quantity was considered from both the product of the order quantity and a random yield rate. Dillon and Mazzola (2010) focused on the situation where many retailers diversified their supply disruption risk by sourcing from multiple suppliers. This previous paper discussed a global supply chain (GSC) with supply disruptions due to a natural disaster or a human-induced event. The concept of a supply-risk network was introduced in order to capture potential disruptions. The optimal selection regarding suppliers in GSC was determined.

    The previous studies mentioned above incorporated supply disruptions into both production processes and distribution processes in a supply chain model. However, they did not discuss concretely processes of supply disruptions which occurred in a SC/GSC. Furthermore, suppliers and manufacturers may face supply disruptions including natural disasters and the failures in production processes. It is necessary for retailers to consider the effects of supply disruptions on their optimal ordering policy as to the relevant process where supply disruptions may occur. Xanthopoulos et al. (2012) tackled jointly supply chain disruption management and risk aversion issues for supply chain procurement. Generic single period (newsvendor- type) inventory models was proposed in order to capture the trade-off between inventory policies and disruption risks in a dual-sourcing supply chain network under both no constraint and service level constraints. It was considered that supply disruptions occurred due to natural disasters and machine breakdowns in the dualsourcing supply chain network. Here, it was assumed that the individual event probability of a supply disruption in each supply channel was different in the dual-sourcing supply chain. However, in this previous paper, the event probability of the supply disruption in each supply channel was not distinguished between a natural disaster and a failure in a production process. Also, this previous paper did not compare the optimal inventory management with supply disruptions under a centralized supply chain with those under a decentralized supply chain. Li et al. (2010) investigated the sourcing strategy of a retailer and the pricing strategies of two suppliers in a supply chain under an environment of supply disruption. This previous paper characterized the sourcing strategies of the retailer in a centralized supply chain (CSC) and a decentralized supply chain (DSC). In a decentralized supply chain, it was assumed that two suppliers were either competitive or cooperative. The optimal order quantities and the optimal wholesale prices were found in both CSC and DSC. It was assumed that any supplier whose location faced a natural disaster could not produce products and a retailer could not order products from the relevant supplier there, and then the retailer procured the shortage of the required quantity of product from a spot market. However, this previous paper assumed that the event probabilities of not only natural disasters in locations of two suppliers, but also failures of their production processes were same probability. Under the assumption, it was impossible to identify the event probabilities of supply disruptions which each supplier might face. It was hard for a retailer to determine the optimal ordering policies to multiple suppliers whose event probabilities are different. Also, the previous papers of Xanthopoulos et al. (2012) and Li et al. (2010) did not discuss any fixed cost including the equipment machine, the employment cost and the electricity charges, etc in production cost of productions. Also, supply chain coordination (SCC) was not considered and these previous papers did not consider the limitation of demand information of products. A demand of a single type of products is assumed a random variable, and the probability distribution of the demand is known. This implies that it is possible to know the full information of the product demand. In a real situation for SCM, it may be possible to know the limited information such as mean and variance of the product demand. Under such a situation, Gallego and Moon (1993), Moon and Gallego (1994), Moon and Choi (1995), Alfares and Elmorra (2005) applied the distribution- free approach (DFA) into the newsboy problem for a single type of products in a single period.

    Differing from the previous papers above, this paper verifies theoretically both the optimal ordering policy and supply chain coordination in a dual sourcing supply chain (DSSC) with a retailer and two manufacturers in consideration of the uncertainty in product demand and supply disruptions after two manufacturers received the retailer’s order of a single type of products. Concretely, this paper tries to provide the following contributions for academic researchers and real-world policymakers regarding operations in a DSSC with the uncertain demand and supply disruptions: Presentations of theoretical analysis to • verify how the uncertainty in product demand affect the optimal ordering policy in a DSSC by considering two scenarios of the demand information of products under supply disruptions: (scenario 1): the demand distribution is known and (scenario 2): only both mean and variance of the demand are known.

    • verify the lower limit of the total expected profits of a retailer and the whole system which face the uncertainty in the product demand and supply disruptions in a DSSC by using DFA.

    • verify how the different event probabilities of supply disruptions regarding a natural disaster and a failure in the production process affect the optimal ordering policy in a DSSC as to the demand information of products.

    • verify how the separation between variable cost and fixed cost in production cost as to a situation without/with supply disruptions affects the optimal ordering policy in a DSSC as to the demand information of products.

    • provide how not only supply chain coordination in a DSSC regarding the unit wholesale prices between a retailer and two manufacturers is incorporated into the optimal decision of ISC, but also it can shift to the optimal decision under ISC from that under DSC.

    Concretely, this paper discusses a dual-sourcing supply chain (DSSC) which consists of a retailer and two manufacturers. The DSSC faces both the uncertainty in product demand and supply disruptions due to a natural disaster and a failure in the production process after two manufacturers received the retailer’s order of a single type of products. In terms of supply disruptions, this paper considers a natural disaster which occurs in the location of each manufacturer and a failure in the production process such as quality and machine breakdowns. Here, it is assumed that the event probabilities of two manufacturers regarding supply disruptions including a natural disaster and a production process failure are different. When a natural disaster occurs to each manufacturer, it is assumed that it is impossible for relevant manufacturer to produce any product and when a failure in production process occurs to each manufacturer, it is assumed that it is possible for the relevant manufacturer to produce and supply some rate of the retailer’s order quantity. Also, it is necessary for two manufacturers to separate between variable cost and fixed cost in production cost of products in the situation where they may face supply disruptions in their production processes. This is because two manufacturers always incur the fixed cost in the production cost of products despite the production quantity of products.

    As to two situations: demand information of the product and supply disruptions due to a natural disaster and a failure in the production process, this paper proposes two types of the optimal decisions for a DSSC: a decentralized DSSC (DSC) and an integrated DSSC (ISC). Here, the optimal decision under DSC in this paper adopts the Stackelberg game (Aust and Buscher, 2012; Berr, 2011; Cachon and Netessine, 2004; Cai et al., 2009; Esmaeili and Zeephongsekul, 2010; Hu et al., 2011; Lee and Ammons (2011), Leng and Parlar, 2009; Liu et al., 2012; Mukhopadhyay et al., 2011; Xu et al., 2012; Yan and Su, 2012). This paper considers that a retailer is a leader of the decision-making and two manufacturers are followers of the retailer’s decision-making. Under DSC, the optimal ordering policy is decided to maximize the total expected profit of a retailer. Under ISC, a policy-maker under ISC decides the optimal ordering policy to maximize the total expected profit of the whole system which is the sum of the total expected profits of all members in the DSSC as to above situations.

    Besides, profit sharing is discussed as supply chain coordination (SCC) between a retailer and two manufacturers in order to guarantee more profits to all members when the optimal decision under ISC is adopted. Concretely, the following two approaches of profit sharing are discussed under the optimal decision under ISC:

    • Profit sharing I: coordinating the unit wholesale price between a retailer and two manufacturers under the optimal decision of ISC as Nash bargaining solution considering profit balance.

    • Profit sharing II: coordinating the unit wholesale price of each manufacturer by combining Profit sharing I and the magnitude relation between the total expected profit of a retailer and the sum of the total expected profits of two manufacturers.

    Using the numerical examples, the numerical analysis illustrates how four factors: (i) event probability of a natural disaster, (ii) event probability of a failure in production process, (iii) production ratio after a failure occurs in production process and (iv) demand information of the products, affect the optimal ordering policies to two manufacturers under DSC and ISC. Also, the optimal order quantities and the total expected profits under DSC are compared with those under ISC. The effects of profit sharing I and II as SCC on the total expected profits of members under the optimal decision of ISC are verified. The benefit of Profit sharing I is compared with that of Profit sharing II in aspects of the profit of a retailer who is a leader of the decision-making under DSC.

    The contribution of this paper is to provide the following managerial insights from the outcomes obtained from the theoretical research and the numerical analysis to academic researchers and real-world policymakers regarding operations in a DSSC with the uncertain demand and supply disruptions:

    • The optimal order quantities to two manufacturers in the scenario 2, where only both mean and variance are known, are determined as lower values than the scenario 1, where the distribution of product demand is known. This is due to the situation where the optimal ordering policy in the scenario 2 is made under the worst situation where a retailer obtains the lowest total expected profit.

    • The optimal order quantities to two manufacturers under ISC can be determined as larger values than those under DSC even if demand information of products is limited and supply disruptions occur. Therefore, the optimal ordering policy under ISC can encourage the more assured procurement of product in a DSSC even under uncertainty in product demand and supply disruptions.

    • It is possible to guarantee to bring more profits to all members (a retailer and two manufacturers) in a DSSC by supply chain coordination adjusting the unit wholesale prices of two manufacturers between all members under the optimal ordering policy under ISC.

    The rest of this paper is organized as follows: in Section 2, operational flows of a DSSC addressed in this paper is described. In Section 3, model assumptions of the DSSC in this paper are described. In Section 4, the expected profits and the total expected profits of a retailer and two manufacturers and the whole system in the DSSC with the uncertain demand and supply disruptions are described. In Section 5 proposes the optimal ordering policy of a single type of products under DSC with the uncertain demand and supply disruptions. Also, Section 6 proposes the optimal ordering policy of a single type of products under ISC with the uncertain demand and supply disruptions. Section 7 incorporates two types of profit sharing approaches as SCC in order to encourage the optimal decision under ISC, guaranteeing the more total expected profits of all members under ISC than under DSC. Section 8 shows the results in numerical analysis to illustrate not only the optimal ordering policy in a DSSC with the uncertain demand, supply disruptions, but also the benefit of SCC in a DSSC. In Section 9, conclusions, managerial insights and future researches for this paper are summarized.

    2.OPERATIONAL FLOWS OF A DSSC

    1. A dual-sourcing supply chain (DSSC) consists of a retailer and two manufacturers (M1 and M2). Each manufacturer produces a single type of products and a retailer sells them in a market. Two types of supply disruptions may occur to each manufacturer in the DSSC. One is a natural disaster which may occur in the location of each manufacturer. The other one is a production process failure which may occur in the production process of each manufacturer due to quality or machine breakdown.

    2. A retailer orders a single type of products to manufacturer Mi (i = 1, 2) under the uncertainty in product demand. The product order quantity to Mi is Qi (i = 1, 2).

    3. Mi (i = 1, 2) produces the products with the unit production cost ci (i = 1, 2)(c1 < c2). When a natural disaster occurs to the location of Mi, it is impossible to produce any product. When a production process failure occurs in the production process of Mi, the production ratio of Mi is reduced to yi (0 ≤ yi ≤ 1).

    4. Mi (i = 1, 2) sells the products to the retailer with the unit wholesale price wi (i = 1, 2)(w1 < w2).

    5. The retailer sells the products in a market with the unit sales price s of the product. The retailer sells the unsold products at the unit disposal sales price r and incurs the unit shortage penalty cost k of the unsatisfied demand.

    3.MODEL ASSUMPTIONS IN DSSC

    1. Two scenarios of the demand information of a single type of products are assumed: in scenario 1 (j = 1), the demand x follows a probabilistic distribution which is the probability density function, f (x)(0 ≤ f (x)< 1), is known, and in scenario 2 (j = 2), only mean μ(> 0) and variance σ 2(> 0) of the demand x.

    2. Manufacturer 1(M1) and Manufacturer 2(M2) are located in distance. It is assumed that the same natural disaster doesn’t occur to both manufacturers simultaneously, that is, the event probability of a natural disaster αi (i = 1, 2)(0 ≤ αi ≤ 1) which may occur to manufacturer Mi (i = 1, 2) is independent.

    3. The event probability of a production process failure βi (i = 1, 2)(0 ≤ αi ≤ 1) which may occur to Mi (i = 1, 2) is independent.

    4. A retailer can predict event probabilities of supply disruptions, caused by a natural disaster and a production process failure which may occur to Mi (i = 1, 2), as αi (0 ≤ αi ≤ 1) and βi (0 ≤ βi ≤ 1), respectively. Concretely, from 2. (3), nine types of event regarding supply disruptions occurring to manufacturer 1(M1) and manufacturer 2(M2) are considered in this paper. Here, it is assumed that the event probability of each supply disruption is independent. Table 1 shows events and event probabilities of supply disruptions and productive quantity of product of M1 and M2 when a natural disaster and a production process failure occur to Mi (i = 1, 2).

    5. When a natural disaster occurs in the location of Mi (i = 1, 2), it is impossible for the relevant Mi to produce products. In this case, Mi incurs no variable cost for production of products. Also, it is impossible for the retailer to procure any products from the relevant Mi who faces a natural disaster. Meanwhile, when a production process failure occurs to Mi, the production quantity of the relevant Mi reduces to yiQi (i = 1, 2, yi (0 ≤ yi ≤ 1) ). Here, it is assumed that Mi incurs the fixed production cost γ ciQi (i = 1, 2, 0 ≤ γ ≤ 1) regardless if a natural disaster and a production process failure occurs.

    6. The condition sk > wi > cir (i =1, 2) is satisfied so as to guarantee profitable operations of a retailer, manufacturer Mi (i = 1, 2) and the whole system in a DSSC.

    4.EXPECTED PROFITS AND TOTAL EXPECTED PROFITS IN A DSSC

    From 2., 3. and Table 1, the expected profits of a retailer, two manufacturers and the whole system are formulated according to events E1-E9of supply disruptions to manufacturer Mi (i = 1, 2) as to the demand information of a single type of products. First, the profit of a retailer is discussed. The profit of a retailer is formulated from the sales of the products, the procurement cost of the products, the disposal sales of the unsold products and the shortage penalty cost for the unsatisfied demand by considering the magnitude relation between order quantity Qi (i = 1, 2) to manufacturer Mi (i = 1, 2) and product demand x.

    In scenario 1 of demand information of the products, by taking the expectation of the demand x based on a probabilistic distribution f (x)of x, the individual expected profit of a retailer as to events E1-E9is obtained as follows:

    E 1 π R E 1 Q 1 , Q 2 = 0 Q 1 + Q 2 sx + r Q 1 + Q 2 x f x dx + Q 1 + Q 2 s Q 1 , Q 2 k x Q 1 Q 2 f x dx w 1 Q 1 + w 2 Q 2
    (1)
    E 1 π R E 2 Q 1 , Q 2 = 0 Q 2 sx + r Q 2 x f x dx + Q 2 s Q 2 k x x Q 2 f x dx w 2 Q 2
    (2)
    E 1 π R E 3 Q 1 , Q 2 = 0 y 1 Q 1 + Q 2 sx + r y 1 Q 1 + Q 2 x f x dx + y 1 Q 1 + Q 2 s y 1 Q 1 + Q 2 k x y 1 Q 1 Q 2 f x dx w 1 y 1 Q 1 + w 2 Q 2
    (3)
    E 1 π R E 4 Q 1 , Q 2 = 0 Q 1 sx + r Q 1 x f x dx + Q 1 s Q 1 k x Q 1 f x dx w 1 Q 1
    (4)
    E 1 π R E 5 Q 1 , Q 2 = 0 Q 1 + y 2 Q 2 sx + r Q 1 + y 2 Q 2 x f x dx + Q 1 + y 2 Q 2 s Q 1 + y 2 Q 2 k x Q 1 y 2 Q 2 f x dx w 1 Q 1 + w 2 y 2 Q 2
    (5)
    E 1 π R E 6 Q 1 , Q 2 = 0 y 2 Q 2 sx + r y 2 Q 2 x f x dx + y 2 Q 2 s y 2 Q 2 k x y 2 Q 2 f x dx w 2 y 2 Q 2 w 1 Q 1 + w 2 y 2 Q 2
    (6)
    E 1 π R E 7 Q 1 , Q 2 = 0 y 2 Q 2 sx + r y 1 Q 1 x f x dx + y 1 Q 1 s y 1 Q 1 k x y 1 Q 1 f x dx w 1 y 1 Q 1 w 1 Q 1 + w 2 y 2 Q 2
    (7)
    E 1 π R E 8 Q 1 , Q 2 = 0 y 1 Q 1 + y 2 Q 2 sx + r y 1 Q 1 + y 2 Q 2 x f x dx + y 1 Q 1 + y 2 Q 2 s y 1 Q 1 + y 2 Q 2 k x y 1 Q 1 y 2 Q 2 f x dx w 1 y 1 Q 1 + w 2 y 2 Q 2
    (8)
    E 1 π R E 9 Q 1 , Q 2 = 0 kxdx .
    (9)

    Here, Eq. (1) shows the expected profit of a retailer in event E1 where neither a natural disaster nor a production process failure occur to manufacturer 1(M1) and manufacturer 2(M2). Using Table 1, in Eq. (1), the first term is the sum of the expected sales of the products and the expected disposal sales of the unsold products when the demand x is satisfied with the sum of order quantities to two manufacturers, M1 and M2, Q1 + Q2, the second term is the sum of the expected sales of the products and the expected shortage penalty cost for the unsatisfied demand when the demand x is unsatisfied with Q1 + Q2, the third term is the procurement cost of the products from M1 and M2. Similarly, using Table 1, the individual expected profit of a retailer in Eqs. (2)-(9) as to events E2-E9 are obtained as to the situations if a natural disaster and a production process failure occur to M1 and M2. Here, note that the following expected quantities of M1 and M2 change as to events E2-E9, using Table 1: (1) the sales quantity of the products, (2) the excess inventory quantity of the products, (3) the shortage quantity of the products and (4) the procurement quantities of the products from M1 and M2.

    In scenario 2 of the demand information of the products, only both mean μand variance σ 2 of the demand x are known. Using the distribution-free approach (DFA) (Gallego and Moon, 1993; Moon and Gallego, 1994; Moon and Choi, 1995; Alfares and Elmorra, 2005), the upper limits of both the expected excess inventory quantity and the expected shortage quantity due to the magnitude relation between order quantities Qi (i = 1, 2) and the demand x as to events E1-E8 can be derived by using the Cauchy-Schwarz inequality as follows:

    E1 : E Q 1 + Q 2 x + σ 2 + μ Q 1 Q 2 2 1 / 2 μ Q 1 Q 2 2
    (10)
    E1 : E x Q 1 Q 2 + σ 2 + Q 1 + Q 2 μ 2 1 / 2 Q 1 + Q 2 μ 2
    (11)
    E2 : E Q 2 x + σ 2 + μ Q 2 2 1 / 2 μ Q 2 2
    (12)
    E2 : E x Q 2 + σ 2 + Q 2 μ 2 1 / 2 Q 2 μ 2
    (13)
    E3 : E y 1 Q 1 + Q 2 x + σ 2 + μ y 1 Q 1 Q 2 2 1 / 2 μ y 1 Q 1 Q 2 2
    (14)
    E3 : E x y 1 Q 1 Q 2 + σ 2 + y 1 Q 1 + Q 2 μ 2 1 / 2 y 1 Q 1 + Q 2 μ 2
    (15)
    E4 : E Q 1 x + σ 2 + μ Q 1 2 1 / 2 μ Q 1 2
    (16)
    E4 : E x Q 1 + σ 2 + Q 1 μ 2 1 / 2 Q 1 μ 2
    (17)
    E5 : E Q 1 + y 2 Q 2 x + σ 2 + μ Q 1 y 2 Q 2 2 1 / 2 μ Q 1 y 2 Q 2 2
    (18)
    E5 : E x Q 1 y 2 Q 2 + σ 2 + Q 1 + y 2 Q 2 μ 2 1 / 2 Q 1 + y 2 Q 2 μ 2
    (19)
    E6 : E y 2 Q 2 x + σ 2 + μ y 2 Q 2 2 1 / 2 μ y 2 Q 2 2
    (20)
    E6 : E x y 2 Q 2 + σ 2 + y 2 Q 2 μ 2 1 / 2 y 2 Q 2 μ 2
    (21)
    E7 : E y 1 Q 1 x + σ 2 + μ y 1 Q 1 2 1 / 2 μ y 1 Q 1 2
    (22)
    E7 : E x y 1 Q 1 + σ 2 + y 1 Q 1 μ 2 1 / 2 y 1 Q 1 μ 2
    (23)
    E8 : E y 1 Q 1 + y 2 Q 2 x + σ 2 + μ y 1 Q 1 y 2 Q 2 2 1 / 2 μ y 1 Q 1 y 2 Q 2 2
    (24)
    E8 : E x y 1 Q 1 y 2 Q 2 + σ 2 + y 1 Q 1 + y 2 Q 2 μ 2 1 / 2 y 1 Q 1 + y 2 Q 2 μ 2
    (25)

    Appendix A shows the elicitation process of Eqs. (10) and (11) in event E1. In the similar way, the elicitation processes of Eqs. (12)-(25) as to events E2-E8. can be obtained.

    The individual lower limit of the retailer’s expected profit as to events E1-E8 can be obtained by substituting the upper limits of the expected excess inventory quantity and the expected shortage quantity as to events E1- E8 in Eqs. (11)-(25) into terms regarding the expected excess inventory quantity and the expected shortage quantity in the retailer’s expected profit in Eqs. (1)-(8) as to events E1-E8. Appendix A shows the elicitation process of the lower limit of the retailer’s expected profit in event E1. In Similar way, the elicitation processes of the lower limit of the retailer’s expected profit as to events E2-E8. can be derived.

    Next, the profits of two manufacturers, M1 and M2 are discussed. The profit of each manufacturer, Mi (i = 1, 2), is formulated from the wholesales of the products, the variable production cost when products can be produced and the fixed production cost of the products. The expected profit of each manufacturer, Mi (i = 1, 2), as to events E1-E9for order quantity Qi to Mi is formulated as follows:

    E 1 π M i E 1 Q 1 , Q 2 i = 1 , 2 = w i Q i c i Q i γ c i Q i i = 1 , 2
    (26)
    E 1 π M i E 2 Q 1 , Q 2 = γ c 1 Q 1 E 1 π M 2 E 2 Q 1 , Q 2 = w 2 Q 2 c 2 Q 2 γ c 2 Q 2
    (27)
    E 1 π M 1 E 3 Q 1 , Q 2 = w 1 y 1 Q 1 c 1 y 1 Q 1 γ c 1 Q 1 E 1 π M 2 E 3 Q 1 , Q 2 = w 2 Q 2 c 2 Q 2 γ c 2 Q 2
    (28)
    E 1 π M 1 E 4 Q 1 , Q 2 = w 1 Q 1 c 1 Q 1 γ c 1 Q 1 E 1 π M 2 E 4 Q 1 , Q 2 = γ c 2 Q 2
    (29)
    E 1 π M 1 E 4 Q 1 , Q 2 = w 1 Q 1 c 1 Q 1 γ c 1 Q 1 E 1 π M 2 E 5 Q 1 , Q 2 = w 2 y 2 Q 2 c 2 y 2 Q 2 γ c 2 Q 2
    (30)
    E 1 π M 1 E6 Q 1 , Q 2 = γ c 1 Q 1 E 1 π M 2 E6 Q 1 , Q 2 = w 2 y 2 Q 2 c 2 y 2 Q 2 γ c 2 Q 2
    (31)
    E 1 π M 1 E7 Q 1 , Q 2 = w 1 y 1 Q 1 c 1 y 1 Q 1 γ c 1 Q 1 E 1 π M 2 E7 Q 1 , Q 2 = γ c 2 Q 2
    (32)
    E 1 π M i E8 Q 1 , Q 2 i = 1 , 2 = w i y i Q i c i y i Q i γ c i Q i i = 1 , 2
    (33)
    E 1 π M i E9 Q 1 , Q 2 i = 1 , 2 = γ c i Q i i = 1 , 2
    (34)

    Here, Eq. (26) shows the expected profit of each manufacturer, Mi (i = 1, 2), in event E1 where neither a natural disaster nor a production process failure occur to Mi (i = 1, 2). Using Table 1, in Eq. (26), the first term is the wholesales of the products, the second term is the variable production cost of the products and the final term is the fixed production cost of the products. Similarly, using Table 1, the individual expected profit of Mi (i = 1, 2) in Eqs. (27)-(34) as to events E2-E9 are obtained as to the situations if a natural disaster and a production process failure occur to M1 and M2. From Eqs. (26)-(34), it can be seen that the individual expected profit of Mi (i = 1, 2) as to events E1-E9is unaffected by the demand of the products.

    Considering the individual event probability as to events E1-E9in Table 1, the total expected profits considering all events from E1 through E9 of a retailer, two manufacturers (M1 and M2) and the whole system in scenario j (= 1, 2) of the demand information of the products are calculated as the following sum of the individual expected profits for events E1-E9of the relevant members and the whole system:

    G R j Q 1 , Q 2 j = 1 , 2 = l = 1 9 p l E j π R El Q 1 , Q 2
    (35)
    G M i j Q 1 , Q 2 i = 1 , 2 , j = 1 , 2 = i = 1 2 l = 1 9 p l E j π M i El Q 1 , Q 2
    (36)
    G S j Q 1 , Q 2 j = 1 , 2 = G R j Q 1 , Q 2 + G M j Q 1 , Q 2 .
    (37)

    5.OPTIMAL DECISION-MAKING UNDER ISC

    In an integrated DSSC(ISC), a decision-maker under ISC determines the optimal order quantity Qi*Ij(i = 1, 2, j = 1, 2) in scenario j of the demand information of the products so as to maximize the whole system’s total expected profit. From conditions: μ(> 0) and σ 2(> 0) in 3.(1), αi (0 ≤ αi ≤ 1) in 3.(2) and βi (0 ≤ βi ≤ 1) in 3. (3) and yi (0 ≤ yi ≤ 1), in 3.(5), sk > r in 3. (6), the secondorder differential equation of the whole system’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (37) in terms of order quantity Qi (i = 1, 2) to each manufacturer Mi is negative as

    2 G S j Q 1 , Q 2 j = 1 , 2 / Q 1 2 < 0
    (38)
    2 G S j Q 1 , Q 2 j = 1 , 2 / Q 2 2 < 0
    (39)

    (See Appendix B). Also, it is derived that the Hessian matrix of the whole system’s total expected profit is positive in terms of Qi as

    H S j j = 1 , 2 = 2 G S j Q 1 , Q 2 Q 1 2 2 G S j Q 1 , Q 2 Q 1 Q 2 2 G S j Q 1 , Q 2 Q 2 Q 1 2 G S j Q 1 , Q 2 Q 2 2 = 2 G S j Q 1 , Q 2 / Q 1 2 2 G S j Q 1 , Q 2 / Q 2 2 2 G S j Q 1 , Q 2 / Q 1 Q 2 2 G S j Q 1 , Q 2 / Q 2 Q 1 > 0
    (40)

    (See Appendix B). Eq. (40) indicates that the whole system’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (37) has the unique values regarding optimal order quantities, QiIj (i = 1, 2, j = 1, 2), to each manufacturer, Mi (i = 1, 2), so as to maximize Eq. (37). Therefore, the optimal order quantities, QiIj (i = 1, 2, j = 1, 2), can be determined as order quantities Qi (i = 1, 2) which satisfy the conditions where the first-order differential equation of the whole system’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (37) in terms of order quantity Qi (i = 1, 2) is 0 shown in Eqs. (42) and (43) (See Appendix C). Concretely, this paper determines the optimal order quantity QiIj (i = 1, 2, j = 1, 2) to each manufacturer, Mi (i = 1, 2), under ISC in scenario j (= 1, 2) of the demand information of the products as integer values, satisfying Eq. (40) and the following equations:

    Max G S j Q 1 , Q 2 j = 1 , 2
    (41)
    Subject to G S j Q 1 , Q 2 j = 1 , 2 / Q 1 = 0
    (42)
    G S j Q 1 , Q 2 j = 1 , 2 / Q 2 = 0
    (43)

    using the numerical calculation and the numerical search.

    6.OPTIMAL DECISION-MAKING UNDER DSC

    Under a decentralized DSSC (DSC), this paper adopts the optimal decisions approach in the Stackelberg game (Aust and Buscher, 2012; Berr, 2011; Cachon and Netessine, 2004; Cai et al., 2009; Esmaeili and Zeephongsekul, 2010; Hu et al., 2011; Lee and Ammons(2011), Leng and Parlar, 2009; Liu et al., 2012; Mukhopadhyay et al., 2011; Xu et al., 2012; Yan and Su, 2012). Here, a retailer is the leader of the decision-making under DSC, and two manufacturers are the followers of the decisionmaking. This is because a retailer sells a single type of products in a market. Therefore, the retailer can earn the more total expected profit than each manufacturer Mi (i = 1, 2). The retailer determines the optimal order quantity Qi*Dj (i = 1, 2, j = 1, 2) to Mi in scenario j of the demand information of the demands so as to maximize the total expected profit of the retailer. Each manufacturer, Mi (i = 1, 2), produces the same quantity of the optimal order quantity Qi*Dj and sells the products with the unit wholesale price wi to the retailer.

    From conditions: μ(> 0) and σ 2(> 0) in 3.(1), αi(0 ≤ αi ≤ 1) in 3.(2) and βi (0 ≤ βi ≤ 1) in 3. (3) and yi (0 ≤ yi ≤ 1), in 3.(5), sk > r in 3. (6), the second-order differential equation of the retailer’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (35) in terms of order quantity Qi (i = 1, 2) to each manufacturer Mi is negative as

    2 G R j Q 1 , Q 2 j = 1 , 2 / Q 1 2 < 0
    (44)
    2 G R j Q 1 , Q 2 j = 1 , 2 / Q 2 2 < 0
    (45)

    (See Appendix B). Also, it is derived that the Hessian matrix of the retailer’s total expected profit is positive in terms of Qi (i = 1, 2) as

    H R j j = 1 , 2 = 2 G R j Q 1 , Q 2 Q 1 2 2 G R j Q 1 , Q 2 Q 1 Q 2 2 G R j Q 1 , Q 2 Q 2 Q 1 2 G R j Q 1 , Q 2 Q 2 2 = 2 G R j Q 1 , Q 2 / Q 1 2 2 G R j Q 1 , Q 2 / Q 2 2 2 G R j Q 1 , Q 2 / Q 1 Q 2 2 G R j Q 1 , Q 2 / Q 2 Q 1 > 0
    (46)

    (See Appendix B). Eq. (46) indicates that the retailer’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (35) has unique values regarding optimal order quantities, QiDj (i = 1, 2, j = 1, 2), to each manufacturer, Mi (i = 1, 2), so as to maximize Eq. (35). Therefore, the optimal order quantities, QiDj (i = 1, 2, j = 1, 2), can be determined as order quantities Qi (i = 1, 2) which satisfy the conditions where the firstorder differential equation of the retailer’s total expected profit under scenario j (= 1, 2) of the demand information in Eq. (35) in terms of order quantity Qi (i = 1, 2) is 0 shown in Eqs. (48) and (49) (See Appendix D). Concretely, this paper determines the optimal order quantity QiDj (i = 1, 2, j = 1, 2) to each manufacturer, Mi (i = 1, 2), under DSC in scenario j (= 1, 2) of the demand information as integer values, satisfying Eq. (46) and the following equations:

    Max G R j Q 1 , Q 2 j = 1 , 2
    (47)
    Subject to G R j Q 1 , Q 2 j = 1 , 2 / Q 1 = 0
    (48)
    G R j Q 1 , Q 2 j = 1 , 2 / Q 2 = 0
    (49)

    using the numerical calculation and the numerical search.

    7.PROFIT SHARING AS SUPPLY CHAIN COORDINATION (SCC)

    Supply chain coordination (SCC) between a retailer and two manufacturers is discussed in order to guarantee the more total expected profit for all members under the optimal decision of ISC. This paper adopts the following two approaches of profit sharing as SCC under ISC:

    • Profit sharing I: coordinating the unit wholesale price between a retailer and two manufacturers under the optimal decision of ISC as Nash bargaining solution considering profit balance

    • Profit sharing II: coordinating the unit wholesale price of each manufacturer by combining Profit sharing I and the magnitude relation between the profit ratio of a retailer and that of two manufacturers.

    This paper verifies analytically how profit sharing as SCC can bring the more total expected profits of all members under the optimal ordering policy of ISC in scenario j(= 1, 2) of the demand information of the products.

    First, profit sharing I is discussed. In profit sharing I, the unit wholesale prices of two manufacturers, M1 and M2, are coordinated between a retailer and two manufacturers, M1 and M2, under the optimal ordering policy of ISC. Concretely, as to scenario j of the demand information of the products, the unit wholesale prices of two manufacturer, M1 and M2, are coordinated as Nash bargaining solutions (Mahesh Greys, 2008; Du et al., 2011), w1N1j, w2N1j, so as to maximize Eq. (50) satisfying the constrained conditions in Eqs. (51) and (52):

    max π w 1 N1j , w 2 N1j = G R w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij G R w 1 , w 2 Q 1 Dj , Q 2 Dj × G M 12 w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij G M 12 w 1 , w 2 Q 1 Dj , Q 2 Dj
    (50)
    Subject to G R w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij G R w 1 , w 2 Q 1 Dj , Q 2 Dj > 0
    (51)
    G M 12 w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij G M 12 w 1 , w 2 Q 1 Dj , Q 2 Dj > 0
    (52)
    G M 12 w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij = i = 1 2 G M i w 1 N1j , w 2 N1j Q 1 Ij , Q 2 Ij
    (53)
    G M 12 w 1 , w 2 Q 1 Dj , Q 2 Dj = i = 1 2 G M i w 1 , w 2 Q 1 Dj , Q 2 Dj .
    (54)

    Here, Eq. (50) coordinates the unit wholesale prices of two manufacturers, M1 and M2, as w1NIj and w2NIj under the optimal ordering policy of ISC in scenario j(= 1, 2) of the demand information. w1NIj and w2NIj are determined so as to maximize the multiplication of (the difference of the total expected profit of a retailer for w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information and that for w1 and w2 under the optimal decision of DSC in scenario j(=1,2) of the demand information) and (the difference of the sum of the total expected profits of two manufacturers for w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information and that for w1 and w2 under the optimal decision of DSC in scenario j(= 1, 2) of the demand information).

    Also, Eq. (51) is the constrained condition to guarantee the situation where the total expected profit of a retailer for the coordinated wholesale prices, w1NIj and w2NIj , of two manufacturers, M1 and M2, under the optimal decision of ISC in scenario j(= 1, 2) of the demand information is always higher than that for the wholesale prices w1 and w2 provided by two manufacturers, M1 and M2, under the optimal decision of DSC in scenario j(= 1, 2) of the demand information. Similarly, Eq. (52) is the constrained condition to guarantee the situation where the sum of the total expected profits of two manufacturers, M1 and M2, for the coordinated wholesale prices, w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information is always higher than that for the wholesale prices w1 and w2 under the optimal decision of DSC in scenario j(= 1, 2) of the demand information. Eq. (53) indicates the sum of the total expected profits of two manufacturers for w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information. Eq. (54) indicates the sum of the total expected profits of two manufacturers for w1 and w2 under the optimal decision of DSC in scenario j(= 1, 2) of the demand information.

    Next, Profit sharing II is discussed. In Profit sharing II, the unit wholesale prices of two manufacturers, M1 and M2, are coordinated as w1NIj and w2NIj by combining Profit sharing I considering the profit balance and the magnitude relation between the total expected profit of a retailer and the sum of the total expected profits of two manufacturers, M1 and M2. A retailer is the leader of the decision-making under DSC and earns most of the total expected profit of the whole system in DSC. This approach adds newly the following condition:

    G R w 1 N2j , w 2 N2j Q 1 Ij , Q 2 Ij G R w 1 , w 2 Q 1 Dj , Q 2 Dj > G M 12 w 1 N2j , w 2 N2j Q 1 Ij , Q 2 Ij G M 12 w 1 , w 2 Q 1 Dj , Q 2 Dj
    (55)

    to the constrained conditions, Eqs. (51) and (52), in Profit sharing I. Here, Eq. (55) is the constrained condition to guarantee the situation where (the difference of the total expected profit of a retailer for w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information and that for w1 and w2 under the optimal decision of DSC in scenario j(= 1, 2) of the demand information) is higher than (the difference of the sum of the total expected profits of two manufacturers for w1NIj and w2NIj under the optimal decision of ISC in scenario j(= 1, 2) of the demand information and that for w1 and w2 under the optimal decision of DSC in scenario j(= 1, 2) of the demand information). Therefore, Profit sharing II coordinates the unit wholesale prices of two manufacturers, M1 and M2, to w1N2j (i = 1, 2, j = 1, 2) so as to maximize Eq. (50) under the constrained conditions shown in Eqs. (51), (52) and (55) as to scenario j(= 1, 2) of the demand information.

    8NUMERICAL ANALYSIS

    The analysis numerically investigates how four factors: (i) event probability of a natural disaster, (ii) event probability of a failure in production process, (iii) production ratio after a failure occurs in production process and (iv) demand information of the products, impact the optimal ordering policies to two manufacturers under DSC and ISC. Also, the optimal order quantities and the total expected profits under DSC are compared with those under ISC. Besides, the effects of Profit sharing as supply chain coordination (SCC) on the total expected profits of all members under the optimal decision of ISC are verified. The benefit of Profit sharing I is compared with that of Profit sharing II in aspects of the profit of a retailer who is a leader of the decision-making under DSC.

    The following values of system parameters are provided as numerical examples: s = 280, r = 30, k = 220, γ = 0.4, c1 = 60, c2 = 61, w1 = 123, w2 = 125, αi = βi = [2(%), 13(%)] and yi = 60(%). All data sources of the numerical examples in this paper above are provided so as to satisfy the following conditions:

    guaranteeing profitable operations of a retailer, two manufacturers, M1 and M2, and the whole system.

    In scenario 1 of the demand information of a single type of products, The demand x follows the normal distribution with mean μand variance σ 2. Here, as the numerical examples, this paper sets μand σ 2as μ= 1000 and σ 2 = 3002, satisfying the condition where μ − 3σ 2 ≥ 0. It is because the product demand follows the normal distribution, and the probability Pr ((μ ) ≤ x ≤ (μ + )) is known as 99.73(%). In scenario 2 of the demand information, only both mean μ and variance σ 2 of the product demand x are known. In the numerical examples, the values of mean μ and variance σ 2 of the product demand x in scenario 2 of the demand information are known as μ = 1000 and σ 2 = 3002 which are same values as scenario 1. All data sources of the numerical examples satisfying the above conditions are modifiable if necessary for sensitive analysis.

    The individual optimal order quantities to two manufacturers, M1 and M2, under DSC can be determined so as to satisfy Eqs. (46)-(49), using the numerical calculation and numerical search in the range where 0 ≤ Qi (i = 1, 2) ≤ μ + . Also, the individual optimal order quantity to two manufacturers, M1 and M2, under ISC can be determined so as to satisfy Eqs. (40)-(43), using the numerical calculation and numerical search in the range where 0 ≤ Qi (i = 1, 2) ≤ μ + . Here, the upper limit of the numerical search regarding the individual optimal order quantities under DSC and ISC, Qikj (k = D, I; i = 1, 2; j = 1, 2), in each scenario of the demand information is set to (μ + ). It is because the product demand follows the normal distribution, the probability of the product demand Pr ({0 ≤(μ )} ≤ x ≤ (μ + )) is known as 99.73(%) and the optimal order quantities Qikj are found in the prospective range of the product demand.

    A computer programming was developed by using Visual Studio C# in Visual Studio Express 2010 for Windows Desktop in order to conduct numerical experiments and obtain the results for the optimal order quantities under DSC and ISC by the numerical calculation and the numerical search. In the development of the computer programming and implementation of the numerical experiment, the following computer: the Dell computer, Vostro 260s model, CPU: Intel(R) Core(TR) i5-2400, 3.10 GHz: Memory: 4 GB, OS: Windows 7 Professional 32 bit was used in this paper.

    8.1Effect of Supply Disruption due to A Natural Disaster to Two Manufacturers on the Optimal Ordering Policy

    It is investigated how a natural disaster which may occur to two manufacturers, M1 and M2, affect the optimal order quantities to M1 and M2 and the total expected profits under DSC and ISC as to scenario j (= 1, 2) of the demand information of the products. Table 2 shows the effect of a natural disaster αi (i = 1, 2) on the optimal ordering policy and the total expected profits under ISC and DSC as to scenario j (= 1, 2) of the demand information. In Table 2, α1 = [2(%), 13(%)],α2 = βi (I = 1, 2) = 2(%) and yi (i = 1, 2) = 60(%) were used.

    From Table 2, the following results are verified:

    • When the event probabilities of a natural disaster, α1 and α2 , to Manufacturer 1 (M1) and Manufacturer 2 (M2) is low such as 2(%), the retailer tends to order the more quantity of the product to M1 under DSC and ISC regardless of any scenario of the demand information. This is because the unit wholesale price and production cost of M1 is cheaper than those of M2, that is, w1 < w2 and c1 < c2.

    • The higher α1 under a fixed α2 = 2(%) is, the smaller the optimal order quantity to M1 under DSC and ISC is, meanwhile the larger that to M2 is regardless of any scenario of the demand information. This is because a retailer tends to order the more quantity of the product to M2 who can supply the required quantity of products reliably and safely, even if w1 < w2 and c1 < c2. Therefore, regardless of any scenario of the demand information, it can be seen that the higher α1 under a fixed α2 = 2(%) is, the lower the total expected profit of M1 is, meanwhile the higher that of M2 is.

    • The total expected profits of a retailer and the whole system tend to reduce when event probability of a natural disaster α1 increases. This is because the unit whole sale price and production cost of M2 are higher than those of M1 and the order quantity to M2 increases in this case.

    8.2.Effect of Supply Disruption Due to a Production Process Failure to Two Manufacturers on the Optimal Ordering Policy

    It is investigated how a production process failure which may occur to two manufacturers, M1 and M2, af fect the optimal order quantities to M1 and M2 and the total expected profits under DSC and ISC as to scenario j(= 1, 2) of the demand information of the products. Table 3 shows the effect of a production process failure βi (i = 1, 2) on the optimal ordering policy and the total expected profits under ISC and DSC as to scenario j(= 1,2) of the demand information. In Table 3, β1 = [2(%), 13(%)], β2 = αi (i = 1, 2) = 1(%) and yi = 60(%).

    From Table 3, the following results are verified:

    • When the event probability of a production process failure β1 of M1 is low such as 2(%), the retailer tends to order the more quantity of the product to M1 under DSC and ISC. This is because the unit whole sale price and production cost of M1 is cheaper than those of M2, that is, w1 < w2 and c1 < c2.

    • The higher β1 under a fixed β2 = 2(%) is, it is verified under ISC and DSC that the optimal order quantity to M1 tends to decrease, meanwhile the optimal order quantity to M2 tend to increase.

    • The total expected profits of a retailer and the whole system tend to reduce when event probability of a production process failure β1 increases. The reason is same as that in Table 2.

    In this paper, it is assumed that when a natural disaster occurs to either M1 or M2, it is impossible for the relevant manufacturer to produce any product ordered from a retailer, meanwhile, when a production process failure occurs to either M1 or M2, it is possible for the relevant manufacturer to produce the limited quantity of products determined at a certain production ratio yi ( i = 1, 2, 0 ≤ yi ≤ 1). From Tables 2 and 3, the following results are verified: The reduction volume of order quantity to M1 in Table 2 becomes larger than that in Table 3 as the event probabilities of a natural disaster, α1 , and a production process failure, β1 , to M1 increase under fixed event probabilities α2 and β2 to M2 regardless of any scenario of the demand information. Meanwhile, the increment of order quantity to M2 in Table 2 becomes larger than that in Table 3 as the probabilities of a natural disaster to M1 and a production process failure to M1 increase regardless of any scenario of the demand information. This stems from the difference of the possible production quantity in a DSSC when a natural disaster and a production process failure occur to M1 and M2 regardless of any scenario of the demand information. Therefore, it is verified that the reduction volumes of the total expected profits of a retailer and two manufacturers due to a production process failure in Table 3 are less than those due to a natural disaster in Table 2.

    8.3.Effect of Production Ratio to Two Manufacturers After a Production Process Failure on the Optimal Ordering Policy

    It is investigated how production ratios of two manufacturers, M1 and M2, after a production process failure to M1 and M2, affect the optimal order quantities to M1 and M2 under DSC and ISC and the total expected profits as to scenario j(= 1, 2) of the demand information of the products. Table 4 shows the results mentioned above. In Table 4, two combinations of production ratios of M1 and M2 are considered.

    From Table 4, the following results are verified:

    • The optimal order quantity to M1 in Case 1 is larger than that in Case 2 regardless of the type of the optimal decision in a DSSC and the scenario of the demand information, even if β1 > β2 . This is because M1 in Case 1 has a higher ability to produce the required quantity of the products than M2 in Case 1 has under the situation where y1 > y2, w1 < w2 and c1 < c2 regarding M1 and M2. Meanwhile, the optimal order quantity to M2 in Case 1 is smaller than that in Case 2 regardless of the type of the optimal decision in a DSSC and the scenario of the demand information, even if y1 > y2, w1 < w2 and c1 < c2. This is because M1 in Case 2 has as same ability to produce the required quantity of the products as M2 in Case 1 has under the situation where β1 > β2 regarding M1 and M2. Therefore, the total expected profit of M1 in Case 1 is higher than that in Case 2.

    • Regardless of the type of the optimal decision in a DSSC and the scenario of the demand information, the optimal total order quantity to two manufacturers in Case 1 is smaller than that in Case 2. The total expected profits of the whole system and a retailer in Case 1 are higher than those in Case 2. It is because two manufacturers in Case 2 have lower abilities to produce the required quantity of the products than those in Case 1. Therefore, the more quantity of the products tends to be ordered to cover supply disruption due to production process failures to two manufacturers.

    8.4.Effects of Type of DSSC on the Optimal Ordering Policy

    First, it is investigated how type of DSSC on the optimal ordering policy.

    From Tables 2-4, the following results are verified: The optimal order quantity in ISC is larger than that in DSC regardless of the demand information of the products. The reason is shown as follows: the optimal order quantities to two manufacturers, M1 and M2, under DSC in scenario j (= 1, 2) of the demand information, Q1Dj and Q2Dj (j = 1, 2), are affected by the unit whole sale price wi (i = 1, 2) of each manufacturer. The order quantities under ISC in scenario j (= 1, 2) of the demand information, Q1Ij and Q2Ij (j = 1, 2), are affected by the unit production cost ci(i = 1, 2) of each manufacturer. From model assumptions 3. (2)-(6), wi(i = 1, 2) > ci(i = 1, 2), the value of the cumulative distribution function of product demand under ISC in Eqs. (42) and (43) are larger than that under DSC in Eqs. (48) and (49). The magnitude relation between the optimal product order quantities to two manufacturers under ISC and those under DSC in scenario 2 of the demand information are proved analytically in Appendix E. Therefore, the sum of optimal order quantities, (Q1Ij + Q2Ii )( j = 1, 2) under ISC are determined as a larger value than the sum of optimal order quantities, (Q1Dj + Q2Dj ) ( j = 1, 2) under DSC.

    8.5.Effects of Demand Information of Products on the Total Expected Profits and the Optimal Ordering Policy in DSSC

    It is investigated how the demand information of the products on the optimal ordering policy. From Tables 2-4, the following results are verified:

    • The total expected profits of a retailer and whole system in scenario 2 of the demand information of the products are lower than those in scenario 1. This is because the available demand information is limited in scenario 2. Therefore, the optimal ordering policy in scenario 2 adopting DFA is made so as to maximize both the lowest expected profit of retailer under DSC and that of the whole system under ISC.

    • Regardless of the production ratio of each manufacturer, the optimal order quantity to M1 and the optimal total order quantity under ISC in scenario 2 of the demand information tend to be larger than those in scenario 1 of the demand information. Meanwhile, the optimal order quantity to M2 under ISC in scenario 2 of the demand information tend to be smaller than that in scenario 1 of the demand information.

    8.6.Effect of Supply Chain Coordination on Shift to Optimal Decision under ISC

    The total expected profits of a retailer and two manufacturers and the whole system under the optimal ordering policy of DSC are compared with those under ISC as to the demand information of the products and supply disruptions. From Tables 2-4, the following results are verified: Regardless of a situation without/with supply disruptions, the total expected profits of the whole system and two manufacturers under the optimal ordering policy under ISC are higher than those under DSC, meanwhile the total expected profits of a retailer under the optimal ordering policy under ISC are lower than that under DSC. From the aspect of the total optimization in DSSC, the optimal ordering policy under ISC, which can enhance the total expected profit of the whole system, is recommended. However, it is difficult for the retailer, who is a leader of the decision-making under DSC, to shift the optimal ordering policy under ISC. Under the situation, any reasonable profit sharing is necessary between members under ISC so as to shift to the optimal ordering policy under ISC from that under DSC, guaranteeing the more total expected profits to members under ISC than those under DSC.

    Here, it is investigated how supply chain coordination (SCC) encourage to shift to the optimal decision under ISC from that under DSC. Table 5 shows the effect of profit sharing as supply chain coordination (SCC) on the total expected profits under ISC as to the demand information. In Table 5, the following system parameters are used: α1 = 13(%), α2 = 2.0(%), βi = 2.0(%), yi =60(%) (i = 1, 2).

    From Tables 5, the following results are verified:

    • It can be seen that the expected profits of all members under ISC adopting Profit sharing I and II are higher than those under DSC in both scenarios of the demand information. In both Profit sharing I and II, the increment of the expected profit obtained under ISC is shared between all members by using supply chain coordination adjusting the unit whole sales prices of two manufacturers as Nash bargaining solutions.

    • The total expected profit in scenario 1 of the demand information under ISC adopting profit sharing II is higher than that in Profit sharing I. It is because Profit sharing II combines Profit sharing I considering the profit balance and the magnitude relation between the total expected profit of a retailer and the sum of the total expected profits of two manufacturers.

    For the retailer who is the leader of the decisionmaking under DSC, Profit sharing II is the most reasonable one to encourage all members in DSSC to shift to the optimal decisions under ISC from those under DSC.

    9.CONCLUSIONS

    This paper discussed a dual-sourcing supply chain (DSSC) which consisted of a retailer and two manufacturers. The DSSC faced both the uncertainty in product demand and supply disruptions due to a natural disaster and a failure in the production process after two manufacturers had received the retailer’s order of a single type of products. This paper dealt with the uncertain in demand of the products as (i) full demand information and (ii) uncertain demand with known only mean and variance. Also, when a natural disaster occurs to each manufacturer, it was assumed that it was impossible for relevant manufacturer to produce any product. When a failure in production process occurred to each manufacturer, it was assumed that it was possible for the relevant manufacturer to produce and supply some rate of the retailer’s order quantity. Here, it was assumed that the event probabilities of two manufacturers regarding supply disruptions including a natural disaster and a production process failure were different.

    Under above situation, the optimal ordering policy to two manufacturers was proposed for a decentralized DSSC (DSC) and an integrated DSSC (ISC). The optimal ordering policy under DSC can maximize the retailer’s total expected profit, meanwhile that under ISC can maximize the whole system’s total expected profit.

    Supply chain coordination (SCC) was discussed between a retailer and two manufacturers in order to guarantee more profits to all members when the optimal decision under ISC was adopted. Concretely, as SCC, the following two approaches of profit sharing were adopted under the optimal decision of ISC: In Profit sharing I, the unit wholesale price of each manufacturer was coordinated between a retailer and two manufacturers under the optimal decision of ISC as Nash bargaining solution considering profit balance. In Profit sharing II, the unit wholesale price of each manufacturer was coordinated by Profit sharing I and the magnitude relation between the total expected profit of a retailer and the sum of the total expected profits of two manufacturers.

    Using the numerical examples, the numerical analysis illustrated how four factors: (i) event probability of a natural disaster, (ii) event probability of a failure in production process, (iii) production ratio after a failure occurs in production process and (iv) demand information of the products, affected the optimal ordering policies to two manufacturers under DSC and ISC. Also, the optimal order policy and the total expected profits under DSC are compared with those under ISC. As benefit of SCC, the total expected profits under ISC adopting Profit sharing I was compared with those adopting Profit sharing II in aspects of the profit of a retailer who was a leader of the decision-making under DSC.

    This paper contributed the following managerial insights from outcomes obtained from both the theoretical research and the numerical analysis to both academic researchers and real-world policymakers regarding operations in a DSSC with the uncertain demand and supply disruptions:

    • When supply disruptions affect the procurement of the required quantities of products, it is necessary for decision- makers under both the decentralized supply chain and the integrated supply chain to construct a dualsourcing supply chain (DSSC) or a multiple-sourcing supply chain (MSSC) in order to enable to procure the required quantity of the products reliably and safely from multiple manufacturers.

    • It is essential for manufacturers/suppliers to prepare the required stock, reserve of products or alternative production facility under the situations where they might face supply disruptions such as a natural disaster and a failure in production process.

    • It is necessary that causes of supply disruptions are distinguished between natural disasters and failures in production processes in a DSSC.

    • When the optimal ordering policy for a DSSC with supply disruptions is made, it is necessary to enable to predict the event probabilities regarding natural disasters and failures in production process in a DSSC precisely as much as possible.

    • It is necessary for manufacturers/suppliers to separate between variable cost and fixed cost in production cost of products in the situation where they might face supply disruptions in their production processes.

    • It is necessary to consider the magnitude relation between event probabilities of natural disasters which occur to manufacturers and the unit wholesale price of each manufacturer under the decentralized DSSC/MSSC (DSC). Meanwhile, it is necessary to consider the magnitude relation between manufacturers and the unit production cost of each manufacturer under the integrated DSSC/MSSC (ISC).

    • When the demand of products is uncertain, it is necessary to investigate the demand information of products. When the demand probability is known, it is possible for decision-makers to determine the optimal ordering policy under DSC so as to maximize the total expected profits of a retailer, meanwhile that under ISC is done so as to maximize the total expected profits of the whole system. When only both mean and variance of the demand are known, it is possible for decision-makers to determine the optimal ordering policy under DSC so as to maximize the lowest total expected profit of a retailer using distribution-free approach (DFA), meanwhile that under ISC is done so as to maximize the lowest total expected profit of the whole system using DFA.

    • Introduction of supply chain coordination into the optimal ordering policy under ISC can promote the shift to the optimal ordering policy under ISC from that under DSC, guaranteeing the more total expected profits of all members under ISC. Also, introduction of profit sharing II into the optimal ordering policy under ISC is recommended as the aspects of the total optimization of a DSSC and the total expected profit of a decision-maker under DSC.

    incorporate the following extendable topics into a DSSC:

    • Recovery processes from supply disruptions over time stochastic change of supply disruptions over time.

    • Interaction between locations and initiation times of supply disruptions which and manufacturers may face.

    • Replenishment of the required quantity of products.

    Figure

    Table

    Events, probabilities of supply disruptions and productive quantity (PQ) when a natural disaster (ND) and a production process failure (PPF) occur to manufacturer 1 and manufacturer 2

    The effect of natural disaster on optimal ordering policy and the total expected profits under ISC and DSC as to scenarios of the demand information of the products

    (M1: Manufacturer 1, M2: Manufacturer 2, WS: the whole system).

    The effect of a production process failure on optimal ordering policy and the total expected profits under ISC and DSC as to scenarios of the demand information of the products

    (M1: Manufacturer 1, M2: Manufacturer 2, WS: the whole system).

    Effect of production ratio after a production process failure on optimal ordering policy and the total expected profits under ISC and DSC as to scenario of the demand information of the products

    (M1: Manufacturer 1, M1: Manufacturer 2, WS: the whole system).

    Effect of profit sharing as supply chain coordination on total expected profits under ISC in each demand scenario

    (M1: Manufacturer 1, M2: Manufacturer 2, WS: the whole system).

    REFERENCES

    1. Alfares H K , Elmorra H H (2005) The Distribution- free Newsboy Problem: Extensions to the Shortage Penalty Case , International Journal of Production Economics, Vol.93/94 (8) ; pp.465-477
    2. Aust G , Buscher U (2012) Vertical cooperative advertising and pricing decisions in a manufacturerretailer supply chain: a game-theoretic approach , European Journal of Operational Research, Vol.223 (2) ; pp.473-482
    3. Berr F (2011) Stackelberg equilibria in managerial delegation games , European Journal of Operational Research, Vol.212 (2) ; pp.251-262
    4. Cachon G P , Netessine S Simchi-Levi D , Wu S D , Shen Z J M (2004) Sequential moves: Stackelberg equilibrium concept , Handbook of Quantitative Supply Chain Analysis: Modeling in the e-Business Era, Kluwer, pp.40-41
    5. Cai G G , Zhang Z G , Zhang M (2009) Game theoretical perspectives on dual-channel supply chain competition with price discounts and pricing schemes , International Journal of Production Economics, Vol.117 (1) ; pp.80-96
    6. Chopra S , Reinhardt G , Mohan U (2007) The Importance of Decoupling Recurrent and Distribution Risks in a Supply Chain , Naval Research Logistics, Vol.54 (5) ; pp.544-555
    7. Dillon R L , Mazzola J B (2010) Management of Disruption Risk in Global Supply Chains , IBM Journal of Research and Development, Vol.54 (3) ; pp.10:1-10:9
    8. Du J , Liang L , Chen Y , Cook W D , Zhu J (2011) A bargaining game model for measuring performance of two-stage network structures , Europeans Journal of Operational Research, Vol.210 (2) ; pp.390-397
    9. Esmaeili M , Zeephongseku P (2010) Seller-buyer models of supply chain management with an asymmetric information structure , International Jour nal of Production Economics, Vol.123 (1) ; pp.146-154
    10. Gallego G , Moon I (1993) The Distribution-free Newsboy Problem: Review and Extensions , Journal of the Operational Research Society, Vol.44 (8) ; pp.825- 834
    11. Gerchak Y , Vickson R G , Parlar M (1988) Periodic Review Production Models with Variable Yield and Uncertain Demand , IIE Transactions, Vol.20 (2) ; pp.144-150
    12. Giri B C (2011) Managing inventory with Two Suppliers under Yield Uncertainty and Risk Aversion , International Journal of Production Economics, Vol.139 (1) ; pp.106-115
    13. Guler M G , Bilgic T (2009) On Coordinating an Assembly System under Random Yield and Random Demand , European Journal of Operational Research, Vol.196 (1) ; pp.342-350
    14. Gupta D , Cooper W L (2005) Stochastic Comparisons in Production Yield Management , Operations Research, Vol.53 (2) ; pp.377-384
    15. Gurnani H , Gerchak Y (2007) Coordination in Decentralized Assembly Systems with Uncertain Component yields , European Journal of Operational Research, Vol.176 (3) ; pp.1559-1576
    16. He Y , Zhang J (2008) Random Yield Risk Sharing in a Two-Level Supply Chain , International Journal of Production Economics, Vol.112 (2) ; pp.769-781
    17. He Y , Zhang J (2010) Random Yield Supply Chain with a Yield Dependent Secondary Market , European Journal of Operational Research, Vol.206 (1) ; pp.221-230
    18. He Y , Zhao X (2012) Coordination in Multi- Echelon Supply Chain under Supply and Demand Uncertainty , International Journal of Production Economics, Vol.139 (1) ; pp.106-115
    19. Hu Y , Guan Y , Liu T (2011) Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games , European Journal of Operatinal Research, Vol.210 (2) ; pp.231-240
    20. Jabbarzadeh A , Naini S G J , Davoudpour H (2012) Designing a Supply Chain Network under the Risk of Disruptions , Mathematical Problems in Engineering, Vol.234324;
    21. Keren B (2009) The Single-period Inventory Problem: Extension to Random Yield from the Perspective of the Supply Chain , OMEGA-International Journal of Management Science, Vol.37 (4) ; pp.801-810
    22. Lee C , Realff M , Ammons J (2011) Integration of channel decisions in a decentralized reverse production system with retailer collection under deterministic non-stationary demands , Advanced Engineering Informatics, Vol.25 (1) ; pp.88-102
    23. Leng M , Parlar M (2009) Lead-time reduction in a two-level supply chain: Non-cooperative equilibria vs coordination with a profit-sharing contract , International Journal of Production Economics, Vol.118 (2) ; pp.521-544
    24. Li J , Wang S , Cheng T C E (2010) Competition and Cooperation in a Single-Retailer Two-Supplier Supply Chain with Supply Disruption , International Journal of Production Economics, Vol.124 (2) ; pp.137- 150
    25. Li X , Li Y , Cai X (2012) A Note on the Random Yield from the Perspective of the Supply Chain , OMEGA-International Journal of Management Science, Vol.40 (5) ; pp.601-610
    26. Li X , Li Y , Cai X (2013) Double Marginalization and Coordination in the Supply Chain with Uncertain Supply , European Journal of Operatinal Research, Vol.226 (2) ; pp.228-236
    27. Liang L , Wang X , Gao J (2012) An Option Contract Pricing Model of Relief Material Supply Chain , OMEGA-International Journal of Management Science, Vol.40 (5) ; pp.594-600
    28. Liu Z L , Anderson T D , Cruz J M (2012) Consumer environmental awareness and competition in two-stage supply chain , European Journal of Operational Research, Vol.218 (3) ; pp.602-613
    29. Lodree Jr E J , Taskin S (2008) An Insurance Risk Management Framework for Disaster Relief and Supply Chain Disruption Inventory Planning , Journal of the Operational Research Society, Vol.59 (5) ; pp.674-684
    30. MacKenzie C A , Santos J , Barker K (2012) Measuring Changes in International Production from a Disruption: Case Study of the Japanese Earthquake and Tsunami , International Journal of Production Economics, Vol.138 (2) ; pp.293-302
    31. Mahesh N , Greys S (2008) Game-theoretic analysis of cooperation among supply chain agents: Review and extensions , European Journal of Operational Research, Vol.187 (3) ; pp.719-745
    32. Moon I , Choi S (1995) The distribution free newsboy problem with balking , Journal of the Operational Research Society, Vol.46 (4) ; pp.537-542
    33. Moon I , Gallego G (1994) Distribution free procedures for some inventory models , Journal of the Operational Research Society, Vol.45 (6) ; pp.651-658
    34. Mukhopadhyay S K , Yue X , Zhu X (2011) A Stackelberg model of pricing of complementary goods under information asymmetry , International Journal of Production Economics, Vol.134 (2) ; pp.424-433
    35. Ozbay K , Ozguven E E (2007) Stochastic Humanitarian Inventory Control Model for Disaster Planning , Transportation Research Record, Vol.2022; pp.63-75
    36. Pac M F , Alp O , Tan T (2009) Integrated Workforce Capacity and Inventory Management under Labour Supply Uncertainty , International Journal of Production Research, Vol.47 (15) ; pp.4281-4304
    37. Parlar M , Perry D (1996) Inventory Models of Future Supply Uncertainty with Single and Multiple Suppliers , Naval Research Logistics, Vol.43 (2) ; pp.191-210
    38. Serel D A (2008) Inventory and Pricing Decisions in a Single-Period Problem Involving Risky Supply , International Journal of Production Economics, Vol.116 (1) ; pp.115-128
    39. Tang O , Matsukawa H , Nakashima K (012a) Supply Chain Risk Management , International Journal of Production Economics , Vol.139 (1) ; pp.1-2
    40. Tang O , Musa S N , Li J (2012b) Dynamic Pricing in the Newsvendor Problem with Yield Risks , International Journal of Production Economics , Vol.139 (1) ; pp.127-134
    41. Whipp L (2011) Quake disaster hits Japan manufacturing , http://www.ft.com/intl/cms/s/0/73f7aad6-5b3f-11e0-b2a1-0144feab49a.html#axzz2uyWu3tCA,
    42. Xanthopoulos A , Vlachos D , Iakovou E (2012) Optimal Newsvendor Policies for Dual-Sourcing Supply Chains: A Disruption Risk Management Framework , Computers and perations Research, Vol.39 (2) ; pp.350-357
    43. Xu H (2010) Managing Production and Procurement through Option Contracts in Supply Chains with Random Yield , International Journal of production Economics, Vol.126 (2) ; pp.306-313
    44. Xu J , Jiang W , Feng G , Tian J (2012) Comparing improvement strategies for inventory inaccuracy in a two-echelon supply chain , European Journal of Operational Research, Vol.221 (1) ; pp.213-221
    45. Xu M , Lu Y (2013) The Effect of Supply Uncertainty in Price-Setting Newsvendor Models , European Journal of Operational Research, Vol.227 (3) ; pp.423-433
    46. Yan N N , Sun B W (2012) Optimal Stackelberg strategies for closed-loop supply chain with thirdparty reverse logistics , Asia-Pacific Journal of Operational Research, Vol.29 (5) ; pp.1250026
    47. Yan X , Zhang M , Liu K (2010) A Note on Coordination in Decentralized Assembly Systems with Uncertain Component Yields , European Journal of Operational Research, Vol.205 (2) ; pp.469-478
    48. Zeiler D (2011) Supply Chain Disruptions from Japan Disasters Hit Auto, Electronics Industries , http://moneymorning.com/2011/03/24/supply-chain-disruptions-from-japan-disasters-hit-auto-electronics-industries/,
    49. Zimmer K (2002) Supply Chain Coordination with Uncertain Just-in-time Delivery , International Journal of Production Economics, Vol.77 (1) ; pp.1-15
    Do not open for a day Close