-
Rescheduling a Single Machine with Various Objectives
Industrial Engineering & Management Systems :: Vol.17 No.4 pp.805-818
DOI:https://doi.org/10.7232/iems.2018.17.4.805
Open abstract -
The Single-Allocation Heuristic Hub Location Problem Solving
Industrial Engineering & Management Systems :: Vol.17 No.3 pp.588-599
DOI:https://doi.org/10.7232/iems.2018.17.3.588
Open abstract -
A Branch-and-Bound for Production-and-Delivery Scheduling with Dynamic Delivery Cost Allowed
Industrial Engineering & Management Systems :: Vol.17 No.2 pp.226-242
DOI:https://doi.org/10.7232/iems.2018.17.2.226
Open abstract -
Industrial Engineering & Management Systems :: Vol.17 No.1 pp.1-13
DOI:https://doi.org/10.7232/iems.2018.17.1.001
Open abstract -
A High Quality Solution Constructive Heuristic for No-Wait Flow Shop Scheduling Problem
Industrial Engineering & Management Systems :: Vol.15 No.3 pp.206-214
DOI:https://doi.org/10.7232/iems.2016.15.3.206
Open abstract -
Industrial Engineering & Management Systems :: Vol.15 No.1 pp.1-10
DOI:https://doi.org/10.7232/iems.2016.15.1.001
Open abstract -
Industrial Engineering & Management Systems :: Vol.14 No.4 pp.401-412
DOI:https://doi.org/10.7232/iems.2015.14.4.401
Open abstract -
Industrial Engineering & Management Systems :: Vol.14 No.1 pp.11-21
DOI:https://doi.org/10.7232/iems.2015.14.1.011
Open abstract -
Industrial Engineering & Management Systems :: Vol.14 No.1 pp.22-31
DOI:https://doi.org/10.7232/iems.2015.14.1.022
Open abstract -
Reverse Logistics Network Design with Incentive-Dependent Return
Industrial Engineering & Management Systems :: Vol.13 No.4 pp.383-397
DOI:https://doi.org/10.7232/iems.2014.13.4.383
Open abstract -
A Hierarchical Hybrid Meta-Heuristic Approach to Coping with Large Practical Multi-Depot VRP
Industrial Engineering & Management Systems :: Vol.13 No.2 pp.163-171
DOI:https://doi.org/10.7232/iems.2014.13.2.163
Open abstract -
Solving the Team Orienteering Problem with Particle Swarm Optimization
Industrial Engineering & Management Systems :: Vol.12 No.3 pp.198-206
DOI:https://doi.org/10.7232/iems.2013.12.3.198
Open abstract -
A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem
Industrial Engineering & Management Systems :: Vol.12 No.3 pp.254-263
DOI:https://doi.org/10.7232/iems.2013.12.3.254
Open abstract -
Generalized Vehicle Routing Problem for Reverse Logistics Aiming at Low Carbon Transportation
Industrial Engineering & Management Systems :: Vol.12 No.2 pp.161-170
DOI:https://doi.org/10.7232/iems.2013.12.2.161
Open abstract -
No Tardiness Rescheduling with Order Disruptions
Industrial Engineering & Management Systems :: Vol.12 No.1 pp.51-62
DOI:https://doi.org/10.7232/iems.2013.12.1.051
Open abstract -
Industrial Engineering & Management Systems :: Vol.11 No.3 pp.288-298
DOI:https://doi.org/10.7232/iems.2012.11.3.288
Open abstract -
Heuristics for Locating Two Types of Public Health-Care Facilities
Industrial Engineering & Management Systems :: Vol.11 No.2 pp.202-214
DOI:https://doi.org/10.7232/iems.2012.11.2.202
Open abstract -
Heuristic Approach for Lot Sizing and Scheduling Problem with State Dependent Setup Time
Industrial Engineering & Management Systems :: Vol.10 No.1 pp.74-83
Open abstract -
Industrial Engineering & Management Systems :: Vol.8 No.4 pp.213-220
Open abstract -
A Flexible Branch and Bound Method for the Job Shop Scheduling Problem
Industrial Engineering & Management Systems :: Vol.8 No.4 pp.239-246
Open abstract